  • Powersmith - Custom Transformer Load Centers/PDU
    • 625kVA (20) 200A Subfeeds & (2) 400A Subfeeds
    • 500kVA (20) 200A Subfeeds
  • Schneider Electric High-Efficiency Galaxy VX UPS
    • 625kVA N System and 500kVA N+1 System
  • APC Chilled Water InRow Cooling - 500 Tons
  • Starline Busway - Metered End feeds
  • Current Technology Surge Suppression
  • Equipment Installation Services
  • Comprehensive Commissioning
    • UPS Load Banking




Confidential Client - Data Center New Construction

  • Powersmith - Ultra High-Efficiency Transformers & PDU
  • EcoAisle Hot Aisle Containment
    • Multiple Rack Pods supporting varying rack densities
  • 48U Server Cabinets
  • Modular Scalable APC Symmetra PX UPS
  • Russelectric Bypass Isolation Transfer Switch
  • APC Chilled Water InRow Cooling
  • Equipment Installation Services
  • Comprehensive Commissioning
    • UPS Load Banking
    • PDU Load Banking
    • Integrated System Testing of UPS & HVAC with Server

                      Simulators



High-Density Server Cabinet Deployment 10-20kW Per Cabinet supporting High Tech clients lab space

  • EcoAisle Hot Aisle Containment
  • Starline Busway
  • Modular/Scalable APC Symmetra UPS System
  • Struxtureware DCIM System
  • APC InRow Cooling System
  • Netbotz Temperature System
  • Equipment Installation Services
  • Comprehensive Commissioning
    • UPS Load Banking





This project started out as a small School District data center with a maximum of 12 Server cabinets and Permeter CRAC Units.  Utilizing Schneider InRow cooling units and EcoAisle thermal containment we were able to fully utilize the same space to provide future expansion of an additional 6 server cabients.  The APC Symmetra UPS system will scale up along with the future IT load growth minimizing initial capital expenditures for the school district.

Confidential Client - Data Center New Construction

School District - Data Center New Construction

  • Powersmith - Ultra High Efficiency Transformer
  • EcoAisle Hot Aisle Contaiment
  • Starline Busway
  • Ultra High Efficiency Schneider Electric Galaxy VM UPS system
  • Struxtureware DCIM System
  • Russelectric Bypass Isolation Transfer Switch
  • Uniflair CRAC Units
  • Equipment Installation Services
  • Comprehensive Commissioning
    • UPS Load Banking
    • Starline Busway Testing
    • Integrated System Testing of UPS & HVAC with Server

                      Simulators



SWMCO was brought in early in the design process to help with the MEP layout for a high density data center in a small space.  Air Cooled DX InRow cooling was deployed in an N+1 configuration to support up to 14kW Per cabinet.  Low energy loss was a high priority so Powersmith DOE 2016 Ultra High Efficiency Transformers and Schneider Electric Galaxy VM UPS system were selected to provide the highest possible energy savings in the electrical distribution system.  

Confidential Client - Data Center New Construction

Copyright © SWMCO. All Right Reserved.

  • Powersmith - Ultra High Efficiency Transformer
  • SWMCO Transformer Energy Audit Program


The Department of Public safety was preparing to install additional cooling capacity to an electrical room which was 100+ degrees.  SWMCO was brought in to evaluate the transformers to determine how much energy(heat) was being lost and rejected into the room.  The name plate efficiency of the installed TP-1 transformers was 98% but due to the slight non-linear loading and phase imbalance they were actually operating at 80.8% efficiency resulting in 2200 watts of continuous losses with only 9.5kW of load on the transformer.  Instead of just dealing with the inefficient transformers and corresponding heat, DPS decided to correct the problem by installing high efficiency Powersmiths E-Saver transformers.  


The Powersmith E-Saver transformer is designed to maintain its high efficiency under linear and non-linear loading.  Not only will each Powersmiths transformer save DPS over $3,400 annually but it also prevented them from having to make the costly HVAC upgrades.


How many transformers do you have wasting thousands of dollars in energy annually?


Request a Transformer Energy Audit Here

Department of Public Safety - Transformer Retrofit

SWMCO designed and provided the project management for this 2,500 sqft data center.  This project was executed under an extremely tight timeline.  Starting from the day of equipment delivery, all UPS systems were assembled, cabinets installed and power distribution connected to the racks in less than 7 business days.

  • APC Netshelter Server Cabinets
  • APC InRow Power Distribution
  • APC  Symmetra PX Modular UPS
  • Struxtureware DCIM System
  • Equipment Installation Services



Military Client - New Data Center

  • Powersmith - Ultra High Efficiency Transformer
  • EcoAisle Hot Aisle Contaiment
  • Starline Busway
  • Modular Scalable UPS system
  • Struxtureware DCIM System
  • Equipment Installation Services


SWMCO was involved with the original construction of this data center in 2009 with the maximum design of 150kW capacity.  Our client quickly outgrew that capacity and needed to expand the data center without increasing the physical space for the electrical or mechanical infrastructure.  Powersmiths built to order manufacturing was able to build 225kVA Transformers in the same case size the original 150kVA transformers were housed in.  The APC Symmetra PX UPS systems scalability allowed the addition of 100kW of extra capacity with no additional floor space.  To respond to the increased per cabinet loads 20kW+ we installed a thermal containment system on the server cabinets. The thermal containment system drove up the InRow cooling return air temperatures which then supplied additional cooling capacity and required no new cooling units.

Confidential Client - Data Center Retrofit

  • 160+ 48U Server Cabinets over 40kW each
  • 2000+ Tons Chilled Water InRow Cooling
  • 6,000kW of 415V High Density Modular Power Distribution
  • Modular Scalable UPS system
  • Custom Thermal Containment System
  • Equipment Installation Services


After the successful deployment of the Ranger Supercomputer in 2008, the University of Texas and HMG Associates turned to SWMCO again to assist with the design, layout and execution of the infrastructure to support one of the fastest supercomputers in the world.

University of Texas - Stampede Super Computer

A few of our completed Projects